How we hand over a build so you never need us
Every workflow runs in your accounts, under your keys, with documentation your own team can follow. Here is our handover checklist.


Josie Kemp and Glen Whitaker
It sounds odd for an agency to say, but we measure ourselves partly on how little our clients need us once a build is live. A retainer should be a choice, not a hostage situation.
So every build ends with a handover, and the handover follows the same checklist. This is it.
1. It already runs in your accounts
We never build in our own n8n, Make or Zapier workspace and migrate later. From the first day of the build, everything lives in accounts the client owns, billed to them, under their API keys.
That means no surprise migration at the end, no credentials to transfer and no moment where the workflow briefly stops working because someone forgot a webhook URL.
2. Credentials live in your vault
API keys and OAuth connections are created by someone on the client’s side, or created by us and immediately moved to their password manager. We keep a list of every credential a workflow uses, which scopes it has, and why it needs them.
When the build is done, the client can revoke our access in an afternoon and nothing breaks.
3. One page per workflow
Each workflow gets a single page of documentation, written for the person who will look after it, not for an engineer:
What it does, in two sentences.
What triggers it, and how often it runs.
Each step, with the system it touches.
Where AI is used, which model, and what it is allowed to decide on its own.
What happens when something fails, and who gets alerted.
How to pause it.
That last line matters more than people expect. The first thing anyone wants to know when something looks wrong is how to stop it.
4. A recorded walkthrough
We record a 15-minute walkthrough of each workflow with the person who will own it, showing a real run from trigger to result, a failed run being retried, and where to change the things most likely to change: a field mapping, a routing rule, a prompt.
These videos get watched more than the documentation. They are also what new hires use months later.
5. Alerts go to your people
During the build, failure alerts come to us. At handover we move them to a channel the client’s team watches, with a named owner. If the client takes a retainer, we stay in the channel too.
6. Thirty days of fixes
Every build includes 30 days of fixes after launch. Most issues show up in the first two weeks: an edge case in the data, a supplier who formats invoices differently, an API that rate-limits at month-end. We fix them, update the documentation, and add the case to the evaluation set if an AI step was involved.
7. The retainer is optional
After 30 days, clients choose. About half take a retainer, where we monitor every run, fix issues within a working day, tune prompts and costs each month and build one new automation a month. The other half run things themselves and call us when they want the next build.
Both are fine. The point of the checklist is that the choice is real.
Why we work this way
Early on, we saw too many automations quietly die when the person who built them moved on. Nobody knew how they worked, nobody had the passwords, and the team went back to doing the work by hand.
Building in the client’s accounts, documenting for the owner and handing over properly takes us an extra two or three days per build. It is the best time we spend.
handover
ownership
retainer

Josie Kemp
Co-founder and CEO
Ran revenue operations at two SaaS companies and automated most of her own job before starting Automatiq.

Glen Whitaker
Senior Automation Engineer
Twenty years of integrations, from EDI to n8n. Writes the retries nobody else thinks of.